The client required routine servicing and overhauling of S7 gas turbines at the Abuttifil Field to ensure a stable power supply for critical equipment and operations. RIDA T.S. executed a complete servicing program on seven turbines, successfully restoring performance and maintaining reliable power availability for field operations.
Location
Abuttifil Field, Libya
Date
2021
Solution
Heavy Mechanical Servicing
Precision Turbine Component Overhauling
Field Calibration & System Tuning
Spare Parts Replacements
Project Profile: S7 Gas Turbine Overhauling
Key Project Details
Project Name: S7 Gas Turbine Overhauling - Abuttifil Field
Core Objective: Ensure stable power supply for critical equipment by restoring core turbine performance characteristics.
Scope of Work: Dismantling of turbine enclosures, rotor inspections, alignment verifications, blade cleaning, and parts replacement.
Technology Deployed: Specialized gas turbine boroscopes, high-frequency vibration analyzers, and alignment systems.
Operational Impact:
Restored the operational efficiency of 7 primary field gas turbines.
Secured field production metrics against sudden grid collapse or power shortages.
RIDA T.S. mobilized a dedicated field engineering squad equipped with specialized diagnostic instruments to carry out systematic maintenance inside the Abuttifil site. By identifying internal micro-wear patterns early via boroscopic tracking, the crew replaced high-stress components before any active failures could occur.
Products & Services Used:
Diagnostic Gear: Specialized turbine maintenance boroscopes and digital vibration analysis hardware.
Industrial Consumables: OEM-certified turbine seals, hot-section fasteners, and high-temperature filtration elements.
Post-Project Impact: The successful execution of this overhauling cycle brought the field’s power infrastructure back to peak reliability metrics, keeping extraction pumps running continuously and insulating production from costly technical downtimes.