The Project

RIDA T.S. executed a full Engineering, Procurement, and Construction (EPC) upgrade of the client’s acid plant, covering the maintenance and repair of existing storage tanks and the construction of new containment works. The project introduced automated chemical mixing and plant-wide control through advanced instrumentation, delivering a fully integrated, safer, and more efficient facility.

Location

Libya

Date

2025

Solution

  • Full EPC (Engineering, Procurement, Construction)
  • Automation & Instrumentation
  • Plant Renovation, Commissioning and Training

Project Profile: Acid Plant Renovation

Key Project Details

  • Project Name: Acid Plant Renovation

  • Core Objective: To deliver a fully integrated, safer, and more efficient acid handling facility through a comprehensive modernization and renovation.

  • Scope of Work: Full EPC, Design, Procurement & Logistics, Automation & Instrumentation, Plant Renovation, and Commissioning.

  • Technology Deployed: Chemical handling & storage systems, advanced automation & control panels, and PVC-U / GRP containment systems.

  • Operational Impact:
    ○ Enabled automated chemical mixing and plant-wide control.
    ○ Significantly enhanced facility safety and environmental containment.
    ○ Ensured seamless operator transition through comprehensive training and handover.

RIDA T.S. is proud to have delivered a fully integrated acid handling facility upgrade. By handling the complete procurement cycle—including supplier selection, technical reviews, and logistics leveraging both local and international vendors—we ensured a seamless execution. The addition of advanced control cabinets and full piping replacement solidifies the plant’s operational safety and efficiency.

Products & Services Used:

  • Chemical Handling & Storage: Installation of two additive tanks and a 6000-gallon mixing tank, supported by complete piping replacement using highly durable PVC-U and GRP systems.
  • Automation & Instrumentation: Deployment of a new control cabinet and advanced instrumentation for precise automated chemical mixing and plant-wide oversight.
  • EPC Services: A comprehensive turnkey approach encompassing everything from initial design and global procurement to on-site construction, containment works, and final operator training.

Post-Project Impact:

This project successfully delivered a fully integrated, safer, and highly efficient plant. It provided the client with modernized automated control over hazardous chemical processes, minimizing manual intervention and significantly reducing operational risks.