The client required routine servicing and overhauling of S3 gas turbines at the Tebisti Field to ensure steady power generation for operational equipment. RIDA T.S. performed a complete service program, overhauling turbines, replacing components where needed, and successfully restoring dependable power capacity for critical operations.
Location
Tebisti Field, Libya
Date
2017
Solution
Heavy Rotating Equipment Maintenance
Internal Turbine Blade & Rotor Inspections
Mechanical Refitting & Alignment
Scheduled Component Exchanges
Project Profile: S3 Gas Turbine Overhauling
Key Project Details
Project Name: S3 Gas Turbine Overhauling - Tebisti Field
Core Objective: To maintain steady power generation for operational equipment at Tebisti Field by restoring dependable power capacity.
Scope of Work: Full turbine disassembly, core mechanical assessments, bearing replacements, rotor balancing, and test-cell re-start validations.
Technology Deployed: Specialized industrial turbine alignment tools, boroscopes, and vibration analyzers.
Operational Impact:
Brought critical field power generation turbines back to original design specifications.
Mitigated severe brownout risks inside isolated desert extraction clusters.
RIDA T.S. teams completed the mechanical restoration of the S3 turbine fleet under challenging remote logistics constraints. Every major rotating sub-assembly underwent balancing and integrity validation, guaranteeing smooth mechanical performance when reunited with live field generation grids.
Products & Services Used:
Overhaul Tooling: Advanced industrial boroscopes, thermal imaging tools, and high-resolution vibration monitoring arrays.
Mechanical Parts: Replacement turbine bearings, high-durability seals, and auxiliary fuel nozzle assemblies.
Post-Project Impact: The overhauling project successfully stabilized power availability at the Tebisti Field. Production teams can run heavy-draw extraction machinery without worrying about sudden voltage drops or mechanical generator failure.

