Project: Supply of unloading fuel flow meters for ZWITINA Power Station (GECOL)
Client: General electricity company of Libya (GECOL)
Location: ZWITINA LIBYA
Duration: From 11/04/2012 to 30/04/2012

Project stages:

  • Site survey and engineering
  • Procurements and material supply
  • Construction:
  1. Camp pre-fabrication: fabrication, welding, testing , sandblasting and painting
  2. Site Preparation and material transportation to site
  3. Tie-in
  4. Electrical and instrumentation works
  5. JB and FM sun shade and supports
  6. Finish paint
  • Commissioning and start up