Project: Supply of unloading fuel flow meters for ZWITINA Power Station (GECOL)
Client: General electricity company of Libya (GECOL)
Location: ZWITINA LIBYA
Duration: From 11/04/2012 to 30/04/2012
Project stages:
- Site survey and engineering
- Procurements and material supply
- Construction:
- Camp pre-fabrication: fabrication, welding, testing , sandblasting and painting
- Site Preparation and material transportation to site
- Tie-in
- Electrical and instrumentation works
- JB and FM sun shade and supports
- Finish paint
- Commissioning and start up
Upgrade of Crude Oil Heaters Control System
Client: MOG, Mellitah Oil and gas Date: week 52 - 2017 Carry on with Engineering phase of the project.
Supply and Installation of Custody Transfer Flow-meters
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 52 - 2017 Carry on with the foundation work of system prover base - Earth work. - Back filling. - Compacting. - Earth work quality control tests.
Repair of Heat exchanger tubing in APU Skid on GT-1
Client: GE Power Date: week 02 - 2018 Rida T.S is proceeding with the Site visit to evaluate the job and carrying out the generating Work method of statement for client review and approval.
Supply and Installation of Custody Transfer Flow meters
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 02 - 2018 Rida T.S is carrying on with the foundation work of system prover base for their clients ARC, Azzawyia Oil Refinery Company - Wood shuttering work for prover foundation base. - Setting up RIDA’s new construction area at ARC plant. [...]
Upgrade of Crude Oil Heaters Control System
Client: MOG, Mellitah Oil and gas Date: week 01 - 2018 Carry on with Engineering phase of the project.
Supply and Installation of Custody Transfer Flow-meters
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 01 - 2018 Rida T.S is carrying on with the foundation work of system prover base for their clients: ARC, Azzawyia Oil Refinery Company - Earth work. - Back filling. - Compacting. - Earth work quality control tests. [...]
Upgrade of Crude Oil Heaters Control System
Client: MOG, Mellitah Oil and gas Date: week 50 - 2017 Carry on with Engineering phase of the project.
Supply and Installation of Custody Transfer Flow-meters
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 50 - 2017 Our site construction team had reached 90% progress of the total project site installation work. Was last week the team was working on the following: - Carry out casting the base and Necks for PROVER skid foundations. - Carry [...]