Our company |
Work |
Replacement of 15 Rotrok Valves |
Replacement of 15 Rotrok Valves
Sirte Oil Company
Meter battery plant “crude oil exportation plant”
Replacement of 15 Rotork IQ-2000 “small size “ with 15 Pcs of Rotork-10 “big one with gear box”, the work includes:
- Isolate the system (electrically and mechanically).
- Dismantle the old actuators and remove the connections flanges from them.
- Re-Install the coactions flanges back to the vale bodies.
- Install the new gear box+ New actuators.
- Connect the instrumentations and electrical supply lines to the new system.
- MEGGER and point to point test.
- Functional tests of the new system through DCS .
- Commissioning the system.