Project: Supply of unloading fuel flow meters for ZWITINA Power Station (GECOL)
Client: General electricity company of Libya (GECOL)
Location: ZWITINA LIBYA
Duration: From 11/04/2012 to 30/04/2012
Project stages:
- Site survey and engineering
- Procurements and material supply
- Construction:
- Camp pre-fabrication: fabrication, welding, testing , sandblasting and painting
- Site Preparation and material transportation to site
- Tie-in
- Electrical and instrumentation works
- JB and FM sun shade and supports
- Finish paint
- Commissioning and start up
Supply and Installation of Custody Transfer Flow-meters
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 10&11 - 2019 Carry on with System spools sand blasting and painting .
Carry on study, site visits, surveys for two new prospective projects
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 14 - 2018 Carry on study, site visits, surveys for two new prospective projects : Carry on with System spools sand blasting and painting.
EPC, Fuel gas metering and control system
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 9 & 10 - 2018 Carry on with System spools sand blasting and painting .
Supply and Installation of Custody Transfer Flow-meters
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 9 & 10 - 2018 Carry on with the foundation works of system prover base. Carry on with system sunshades activities . New prover Installation ,etc. Prover concrete slab surface finishing up. Carry on with prover installation works. Carry on with the [...]
Supply ,installation and commissioning of 5 lines of ultrasonic flow metering system for crude oil exportation plant.
Client: SOC, Site Oil Company Date: week 48 - 2017 Finalizing the final stage of system commissioning, and start up test with involvement of 3rd party witnessing of SGS company.
Upgrade of Crude Oil Heaters Control System
Client: MOG, Mellitah Oil and gas Date: week 48 - 2017 Carry on with Engineering phase of the project, 40% of engineering work had been completed.
Supply and Installation of Custody Transfer Flow meters
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 48 - 2017 Our site construction team had reached 90% progress of the total project site installation work. Was last week the team was working on the following: - Grouting work for the system isolation valves foundations. - Fabricating sunshades for the [...]
Upgrade of Crude Oil Heaters Control System
Client: MOG, Mellitah Oil and gas Date: week 49 - 2017 Carry on with Engineering phase of the project.
Supply and Installation of Custody Transfer Flow-meters
Client: ARC, AZZAWYIA Oil Refinery Company Date: week 49 - 2017 Our site construction team had reached 90% progress of the total project site installation work. Was last week the team was working on the following: - Carry out casting the base and Necks for PROVER skid foundations. - Carry [...]
Repair of Heat exchanger tubing in APU Skid on GT-1
Client: GE Power Date: week 52 - 2017 - Carry Site visit to evaluate the job. - Carry out generating Work method of statement for client review and approval .